- (Topic 2)
A tool and technique used in the Develop Project Charter process is:
Correct Answer:
B
- (Topic 3)
What is the total float of the critical path?
Correct Answer:
C
- (Topic 4)
The definition of operations is a/an:
Correct Answer:
D
- (Topic 1)
The number of potential communication channels for a project with 5 stakeholders is:
Correct Answer:
A
- (Topic 5)
What are the identified risks for doing excessive decomposition in a WBS?
Correct Answer:
D