QUESTION 51

- (Exam Topic 3)
Which two requirements must be satisfied to run an Upgrade Advisor report on a Netapp All SAN Array? (choose two)

Correct Answer: AB
To run Active IQ Upgrade Advisor the cluster must have a valid contract, and this tool gets information from Autosupport
Active IQ Digital Advisor shows systems with a valid support contract. You can find more information on this link:
https://kb.netapp.com/Advice_and_Troubleshooting/Data_Storage_Software/ONTAP_OS/How_does_Active_I

QUESTION 52

- (Exam Topic 2)
An SVM's LUN setup needs to have LIFs that are configured for FC access and iSCSI access. The administrator will also be using NetApp Virtual Storage Console.
In this scenario, which three types of LIFs are required? (Choose three.) FC LIFs

Correct Answer: ABC

QUESTION 53

- (Exam Topic 3)
You are configuring a 4-node AFF A400 ONTAP 9.8 cluster. The data center switches have limited ports, and you are given one 10-Gigabit Ethernet port per node for external access.
In this scenario, which three protocols share the same physical port? (Choose three)

Correct Answer: BCD
If we have only ethernet switches available, we can only enable protocols over ethernet such as FCoE, ISCSI and Snapmirror.
NVMe/FC and FC need a SAN Fabric switch to work.

QUESTION 54

- (Exam Topic 2)
Which row of items should you look up in the IMT (Interoperability Matrix Tool) when designing a NetApp Storage Solution for a customer?

Correct Answer: C

QUESTION 55

- (Exam Topic 1)
You deployed a new SVM for FC access, and you used the vserver fcr, create -vserver svm1 - status-admin up command to enable FC service on the SVM. You then created the LIFs for the FC protocol. When you review the status of the LIFs, they show that the admin status is up, but the operational status is down. You have already verified that the ports are physically connected.
In this scenario, what is the next step to bring the LIFs up?

Correct Answer: B