- (Exam Topic 23)
Which option BEST describes how the level of risk is determined?
Correct Answer:
B
- (Exam Topic 22)
Which of the main activities of the fundamental test process does the task ‘verify the test environment set up is correct’ relate to? [K1]
Correct Answer:
C
- (Exam Topic 21)
What is retesting?
Correct Answer:
D
- (Exam Topic 23)
Which of the following would NOT be a common metric used for monitoring test preparation and execution?
Correct Answer:
D
- (Exam Topic 21)
Which of the following statements about risks is most accurate?
Correct Answer:
C
In general, project risk and product risk can be hard to differentiate. Anything that impacts on the quality of the delivered system is likely to lead to delays or increased costs as the problem is tackled. Anything causing delays to the project is likely to threaten the delivered system's quality. The risk-based approach is an approach to managing product risk through testing, so it impacts most directly on product risk.