Debugging and Testing are key activities in the software development lifecycle. Which of the following are 'Debugging' activities?
a) Identifying, a failure
b) Locating the cause of failure
c) Fixing the defect
d) Checking the fix has resolved the failure
Correct Answer:
A
What do you mean by “Having to say NO”..?
Correct Answer:
B
Which aspect in the test estimate is the main risk in this project? 1 credit
Correct Answer:
D
What type of test design technique is the most effective in testing screen-dialog flows?
Correct Answer:
D
For which of the following would maintenance testing be used?
Correct Answer:
B